• Home
  • Nabrawind
    • Company
    • Team
    • Shareholders
    • Patents
    • Certificates
    • Contact
    • Awards & Recognitions
  • Nabralift
  • Nabrabase
NabrawindNabrawindNabrawindNabrawind
Menu
  • Nabrajoint
  • BladeRunner
  • Media
    • News
    • Downloads
    • Videos
    • Gallery
      • Nabrajoint
      • Nabralift
    • Blog
  • Our Projects
    • Highest Tower of Africa Installation
    • BladeRunner – Blade Substitution Bignan Wind Farm
    • BladeRunner executes a 20-ton blade exchange in an ACCIONA Energía wind farm

Company

The ‘SÍ100’ project, approved by the NEXTGENERATIONEU funds in a...

The project “Novel substructure and installation process in deep waters to reduce the cost of offshore wind energy“, SÍ100, has been selected among more than a hundred proposals in the call CDTI Missions 2021 to be funded by the European…

Continue Reading...

Products

Nabrawind’s BladeRunner executes a 20-ton blade exchange in an ACCIONA...

BladeRunner, the crane less blade replacement system developed by Nabrawind, has been used to execute a demonstrator maneuver for ACCIONA Energía in Aragon (Spain), consisting of the uninstallation and installation of a brand new Nordex N149 blade. The operation was…

Continue Reading...

Nabralift

Navassy manufactures the first Self-erecting System for the Nabralift 2.0...

Navassy, made up by Nabrawind, Tetrace and Comansa, will manufacture between 6 and 8 Self-erecting Systems over the next years in order to meet Nabralift’s order backlog  Navassy has accomplished the manufacture of the first Self-erecting System for the Nabralift…

Continue Reading...

Products

Nabrawind introduces BladeRunner, a system that drastically reduces the cost of...

BladeRunner, the new blade installation and de-installation system developed and patented by Nabrawind Technologies, reduces the cost of blade replacement by 70% compared to maintenance operations carried out with cranes. The Spanish company’s new product is applicable to all types…

Continue Reading...
Nabrawind - Prototipo

Nabralift

Nabrawind installs world’s tallest steel wind turbine tower

Nabrawind Technologies has completed the installation of the world’s tallest onshore steel wind turbine tower in Eslava, Northern Spain. Standing at 160m tall, the Nabralift full-scale prototype was installed in under two weeks. The tower’s unique design means it can be…

Continue Reading...

Products

Nabrawind Technologies begins the installation of one of the tallest wind...

On the 8 January preparations started for the installation of one of the tallest wind turbine towers in the world, designed by the Spanish company Nabrawind Technologies, S.L. (NBTECH), in Eslava (Navarra, northern Spain). The objective of this project is…

Continue Reading...

Please active sidebar widget or disable it from theme option.

COMPANY

Nabrawind Technologies is dedicated to the design and development of advanced wind technologies for wind turbine components, as well as engineering services advisory.

CONTACT

Avda. Carlos III 11, 2º Izda
31002, Pamplona
Navarra, Spain
info@nabrawind.com

LEGAL

  • Cookies policy
  • Privacy policy
  • Legal Notice
  • Quality, Environment and Health and Safety Policy

SOCIAL

Social Network Nabrawind - Twitter Nabrawind - Linkedin Nabrawind - Youtube

© 2018 Nabrawind, All Rights Reserved.