Skylift is a craneless wind turbine installation system. It is compatible with any kind of standard wind turbine. The system is integrated by two components. First, a Self-erecting System, capable of installing both nacelle and tower even in extremely high wind conditions (wind speed up to 15 m/s). After that, the BladeRunner installs the rotor also without the need of any kind of crane.
The installation rate is highly efficient, as Skylift may completely install one turbine per week, even in adverse wind conditions. Likewise, Skylift is compatible with the new wind turbine generation (6MW, 7MW,8MW) and capable of installing wind turbines over HH200 meters.

PRODUCTS

Skylift is a craneless wind turbine installation system. It is compatible with any kind of standard wind turbine. The system is integrated by two components. First, a Self-erecting System, capable of installing both nacelle and tower even in extremely high wind conditions (wind speed up to 15 m/s). After that, the BladeRunner installs the rotor also without the need of any kind of crane.
The installation rate is highly efficient, as Skylift may completely install one turbine per week, even in adverse wind conditions. Likewise, Skylift is compatible with the new wind turbine generation (6MW, 7MW,8MW) and capable of installing wind turbines over HH200 meters.
Craneless
Wind turbine, rotor and tower are completely installed with the Self-erecting System, avoiding any kind of cranes.
Wind Insensitive
Skylift operative installation window up to wind speed of 15 m/s and survival system up to 23 m/s gusts.
Fast Installation
The skylift installation rate is 1 turbine / week even under extremely high wind conditions.
Skylift Installation Process
The Skylift installation process is quite simple and efficient. The whole wind turbine is installed in just one week and the process benefits from the main advantages of the system: fully craneless installation and wind insensitivity.
- Foundation. Compatible with any kind of standard foundation. Likewise, Skylift is compatible with Nabrabase foundation, a highly efficient foundation for wind turbines that allows drastic concrete reduction requirements (60%) as well as a relevant CO2 emissions reduction (80%).
- Self-erecting Installation. The self-erecting System installation, which allows installing nacelle and tower avoiding the use of cranes, takes just three days. Once the system has installed the first wind turbine, the transfer to the next position within the wind farm takes one day.
- Nacelle and tower installation. The Self-erecting System installs both nacelle and tower.
- Rotor Installation. Lastly, Bladerunner installs the rotor of the wind turbine.

Skylift Installation Process
The Skylift installation process is quite simple and efficient. The whole wind turbine is installed in just one week and the process benefits from the main advantages of the system: fully craneless installation and wind insensitivity.
- Foundation. Compatible with any kind of standard foundation. Likewise, Skylift it is compatible with Nabrabase foundation, a highly efficient foundation for wind turbines that allows drastic concrete reduction requirements (60%) as well as a relevant CO2 emissions reduction (80%).
- Self-erecting Installation. The self-erecting System installation, which allows installing nacelle and tower avoiding the use of cranes, takes just three days. Once it has installed the first wind turbine, transfer to next position within the wind farm takes one day.
- Nacelle and tower installation. The Self-erecting System installs both nacelle and tower.
- Rotor Installation. Lastly, Bladerunner installs the rotor of the wind turbine.
Maximum auxiliary crane up to 300 tones
Minimum logistics. The whole system fits in just 16 standard containers
The Features

Full Crane-less Installation
No large cranes used in turbine assembly.

Wind Insensitive
Installation up to wind speed of 15 m/s.

Fast Installation
One turbine / week under high wind conditions.