The Lowind-Tech project by Nabrawind has received funding from CDTI
The main objective of the Lowind-Tech is the development of ultralight structural and bonding technologies, accompanied by accessible and scalable installation systems, to drive the next generation of 6 MW wind turbines with tower heights of up to 190 meters in low and ultra-low wind sites. Lowind-Tech is