Advanced Wind Technologies
Advanced Wind Technologies
Advanced Wind Technologies


Nabrawind Self Erecting Tower (Nabralift) is a new tower technology developed to break the barriers that the conventional towers are facing for very high hub heights (> 120m).


Nabrawind Modular Blade System (Nabrajoint) is a technology applicable to any wind turbine blade (existing or new) that allows manufacturing blades in two or more parts that are transported separately and assembled on site.


BadeRunner is a blade’s maintenance and installation system. It is based on the installation of small pieces of equipment on the hub of the wind turbine with which the blade is directly manipulated and ascends and descends in a vertical position.


Nabrabase is a very competitive elevated foundation in wind farms where the concrete supply or the soil conditions may represent a challenge.

Nabrawind Technologies is dedicated to the design and development of advanced wind technologies for wind turbine components. Nabrawind is focused into alternative high added value disruptive technologies with three strategic drivers: drastic cost of energy reduction, solutions to break logistic barriers that currently restrain the onshore wind turbine growth and use of proven baselines technologies to provide robust and reliable components.

Nabrawind Technologies is dedicated to the design and development of advanced wind technologies for wind turbine components. Nabrawind is focused into alternative high added value disruptive technologies with three strategic drivers: drastic cost of energy reduction, solutions to break logistic barriers that currently restrain the onshore wind turbine growth and use of proven baselines technologies to provide robust and reliable components.
Do you want to get more information about Nabrawind? Find here the latest news, articles, downloads, photos and videos from Nabrawind Technologies.


Do you want to get more information about Nabrawind? Found here the latest news, articles, downloads, photos and videos from Nabrawind Technologies.
The ‘SÍ100’ project, approved by the...
The project “Novel substructure and installation process in deep waters to reduce...
Nabrawind’s BladeRunner executes a 20-ton blade...
BladeRunner, the crane less blade replacement system developed by Nabrawind, has been...
InnoVent to implement Nabrawind’s BladeRunner for...
The crane less blade installation and de-installation system will be available for blade...
Nabrawind and InnoVent install the tallest Africa’s...
Nabrawind deployed the craneless self-erecting system to install a Nabralift 2.0 HH144...
Navassy manufactures the first Self-erecting System...
Navassy, made up by Nabrawind, Tetrace and Comansa, will manufacture between 6 and 8...
DNV awards Design Certification to the highest wind...
The certification covers the full Nabralift 2.0 self-erecting tower family, with...

Do you have any question about our advanced wind solutions?

Do you have any question about our advanced wind solutions?